Application · Fasteners
On a mesh-belt or continuous furnace, fasteners come out hot and go straight to the quench or the tempering section. RHB takes that same heat and turns it into the black film. One pass, no second heat cycle, no caustic blackening tank at the end of the line.
Where the money goes
At fastener volumes, a process step is not a line item — it is a throughput limiter. Every extra station adds handling, floor space, headcount and a queue. The conventional route adds four of them after the furnace: preheat, caustic blackening, rinse, dry.
RHB keeps one. Parts leave the tempering section, dip, drain, cure. The step you cannot remove is curing, and its temperature requirement is what decides between the two grades.
What decides the grade
| On a fastener line | Conventional hot black oxide | RHB |
|---|---|---|
| Stations added after the furnace | 4 (preheat, blacken, rinse, dry) | 2 (dip, cure) |
| Bath operating temperature | ≈140 °C caustic | 40–60 °C |
| Acid pickle upstream | Typical | Not used |
| Hydrogen embrittlement route | Open via pickling | No acid, no electrolysis |
| Thread fill risk | Conversion coating, sub-micron scale | Thin film, measured on your parts |
| Spent bath handling | Hot caustic effluent | Near-neutral |
Thread fit and film thickness are validated on your own parts during the trial. We do not quote a film thickness before measuring one.
Common objection
Then the part is cold by the time it reaches you, and RHB is not your process. This is the single most common reason a trial fails, and it is decided by plant layout rather than by chemistry. Bring us in after the tempering stage and it works. Bring us in after the quench tank and it does not.
Next step
We need the part temperature at the take-off point, the curing temperature your line can hold, and any salt spray requirement on the drawing. A 1 L sample follows, which makes about 11 L of working bath.